Rigging
Showcase · Live build

What hangs above your audience's heads.

Load-certified. Inspected. Built by in-house riggers — never day hires. That's what separates a show that runs from an incident report.

100%

Truss with full load certification

2T

Top chain hoist capacity

0

Rigging incidents — since day one

In-house

Rigger team — never day-hires

Box Truss 30×30 & 40×40Ground SupportMother GridFlying TrussChain Hoist 500kg – 2TLoad CertifiedRoutine InspectionIn-house Rigger TeamBox Truss 30×30 & 40×40Ground SupportMother GridFlying TrussChain Hoist 500kg – 2TLoad CertifiedRoutine InspectionIn-house Rigger Team
Why this exists

No part of an event is less allowed to fail than what hangs overhead. Every meter of truss we fly has a paper trail — who inspected it, when, at what load. When regulators or venues ask for documentation, we have it. When they don't, the documentation still exists.

30×30 and 40×40 box truss — light and precise.
01 · Truss System
Truss System

30×30 and 40×40 box truss — light and precise.

High-grade aluminum, tight-tolerance spigot connections, full plate and adapter set. Built to rig fast and strike without drama.

500 kg to 2-ton chain hoists.
02 · Lifting
Lifting

500 kg to 2-ton chain hoists.

Routine inspection, certified controllers, redundant safety. When the truss has to lift with LED, line array, and lighting on it — that's procedure, not a stunt.

Ground support, mother grids, flying truss.
03 · Configurations
Configurations

Ground support, mother grids, flying truss.

Venue has no rigging points? Full ground support. Venue ready to fly? Mother grid with multiple suspension points. Every configuration measured to the venue's structure.

From the field

Builds, not renders.

Mother grid build
Mother grid build
Chain hoist crew
Chain hoist crew
Outdoor ground support
Outdoor ground support
Lighting truss
Lighting truss
Indoor flying truss
Indoor flying truss
Showreel

Hear how we work — before your event day.

Pre-doors load test — fully documented

Pre-doors load test — fully documented

1:24

Full showreel available on request · NDA available

How we work

Four phases. One team accountable from brief to tear-down.

Each phase has a deliverable you can forward to your own stakeholders. Not promises — documents.

01Phase 1

Venue structure & load study

We read the venue's engineering drawings first. We confirm what's safe to hang — with margin.

02Phase 2

Rig plot & method statement

Every point, load, and pull direction documented. Forward-able to your insurer or venue ops.

03Phase 3

Pre-rig inspection

Every truss, chain hoist, and piece of steel checked visually and functionally before going up. Certs on hand on-site.

04Phase 4

Build, supervise, document

In-house rigger team for the full duration. Build photos and inspection logs handed over post-show.

Rigging

Let's plan your rig plot.

Send the venue and equipment list. You'll get a documented rig plot — ready to forward to the venue and insurer.